Fourslide forming feeds flat strip or round wire to a center post, then four cam- or servo-driven tool slides strike it from the front, back and both sides to bend it around the post. It makes complex clips, brackets and wire forms with bends in several directions, including full wraps, using tooling that typically costs $5,000–$25,000, often a fraction of a comparable progressive die.
A method under springs, wire forms, and fourslide.

The schematic plays while it is on screen. Pick a phase to hold it there.
Coil strip or wire feeds in. An in-line press station can pierce holes or notch the strip before forming.
A cutoff tool shears the blank to length in front of the center post.
The front slide pushes the blank against the center post, bending it into a U.
The left and right slides close in, wrapping both legs around the sides of the post.
The rear slide folds the ends over the top of the post to finish the shape.
A stripper pushes the finished part off the post, and the next blank is already feeding.
Typical ranges across principals. Your drawing, material and quantity set the real numbers in the quote.
| Strip capacity | Up to about 3 in (76 mm) wide × 0.100 in (2.5 mm) thick |
|---|---|
| Wire capacity | About 0.010–0.188 in (0.25–4.8 mm) diameter |
| Formed tolerance | ±0.005–0.015 in (±0.13–0.38 mm) |
| Speed | 60–300 parts per minute typical |
| Tooling cost | $5,000–$25,000 |
| Tooling lead time | 4–8 weeks |
| Economic volume | 10,000 parts and up |
Typical values. Pick an alternative to see where each one wins.
Fourslide forming compared with
Fourslide forming · pick it when
Small clips, brackets and wire forms with bends from several directions, including 360° wraps.
Progressive die stamping · pick it when
Flat and formed parts at high annual volume, where a part every stroke pays back the die.
About progressive die stampingRules of thumb principals apply at DFM review. Each one has a reason.
In order of impact.
Slides, center post and cams. Less than a progressive die of similar complexity because each tool does one simple motion.
Parts per minute set by forming complexity and part size.
Spring steels, stainless and beryllium copper cost more than low-carbon steel.
Hardening, stress relief and plating are usually outside operations.
Setup takes hours, so short runs carry it heavily.
Both form parts around a center post with tool slides. Fourslide has four slides driven by cams on four shafts. Multislide and CNC servo slide machines add more slides and programmable motion, which suits more complex parts and faster changeovers.
Each slide does one simple motion with a simple tool, and the machine does the choreography. A progressive die has to build every operation into one precise die set, with stations, lifters and cams.
Yes. Parts formed from annealed spring steel are hardened and tempered after forming. Parts formed from pre-tempered strip often only need a stress relief.
Typically 10,000 parts and up. Tooling is lower than stamping, and machines run 60–300 parts a minute, so unit cost drops quickly with volume.
Quote fourslide forming with a rep.
Send a STEP file and drawing. A rep routes the RFQ to principals that run this method every day, and brings back firm quotes.