FC-0208 is an MPIF Standard 35 powder metal copper steel: iron with 1.5–3.9% copper and 0.6–0.9% carbon, pressed and sintered to shape. At 6.7 g/cm³ as sintered, FC-0208-50 reaches about 60 ksi (410 MPa) tensile with a 50 ksi (345 MPa) minimum yield. Heat treatment raises apparent hardness to HRC 20–43. It suits gears, sprockets, cams and structural parts.

Typical room-temperature values for FC-0208, against all 48 materials in the library.
Bars are relative to the strongest, densest or hottest material in the SSG library. Percentile vs all 48 materials.
Cost, finishes and design rules for each process in this material.
A representative part, powdered metal. Raw material at about $2.00/kg is one line of it; process time and tooling usually matter more.
Spur gear · Powdered metal
Order total $19,120
Drag a row to adjust · click to type
Price per part falls as volume rises
Design checks pass
Open in builderBudgetary estimate for a representative part. Firm quotes come from principals after drawing review.
FC means iron-copper steel. 02 is the nominal copper content, about 2%. 08 is the combined carbon, 0.6–0.9%. The suffix 50 is the minimum yield strength in ksi as sintered. Heat-treated grades carry HT and a minimum tensile strength, for example FC-0208-80HT.
As-sintered FC-0208-50 runs about 60 ksi (410 MPa) tensile, close to hot-rolled low-carbon steel but with much lower ductility. Heat-treated and higher-density grades exceed 100 ksi (690 MPa). For impact-loaded parts, wrought steel or a forging is the better call.
Yes, after the pores are sealed by resin impregnation. Otherwise plating solution gets trapped and bleeds out as corrosion. Steam treatment, which forms black iron oxide, is a common low-cost alternative for corrosion resistance and sealing.
Apparent hardness is the Rockwell reading on porous PM material, which averages hard particles and pores, so it reads lower than the steel itself. MPIF specifies it separately from microindentation hardness, which measures the particles.
Quote it in FC-0208.
Upload CAD or start from a template. The builder prices it in this material and the alternatives.